Home >  Term: Cascading resource
Cascading resource

A resource that can be taken over by more than one node. A takeover priority is assigned to each configured cluster resource group on a per-node basis. In the event of a takeover, the node with the highest priority acquires the resource group. If that node is unavailable, the node with the next-highest priority acquires the resource group, and so on.

0 0

Creator

  • Harry8L
  • (London, United Kingdom)

  •  (V.I.P) 574128 points
  • 100% positive feedback
© 2026 CSOFT International, Ltd.