Home >  Term: Assessed
Assessed

Determined. The level of control risk determined by the auditor, based on tests of controls, is the assessed level of control risk.

0 0

Creator

  • Harry8L
  • (London, United Kingdom)

  •  (V.I.P) 574128 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.