Home > Term: Assessed
Assessed
Determined. The level of control risk determined by the auditor, based on tests of controls, is the assessed level of control risk.
- Part of Speech: noun
- Industry/Domain: Accounting
- Category: Auditing
- Company: AIS
0
Creator
- Harry8L
- 100% positive feedback
(London, United Kingdom)