Home >  Term: modified isochronal test
modified isochronal test

A multirate test designed as a series of drawdown and buildup sequences at different drawdown flow rates, with each drawdown and buildup of the same duration. The purpose of the test is to determine well deliverability, and this type of test is most commonly done in gas wells.

0 0

Creator

  • BSchmidt
  •  (Gold) 2424 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.