Home >  Term: initial shut-in period
initial shut-in period

The comparatively short shut-in period following the initial flow period of a drillstem test. This period is followed immediately by much longer flow and shut-in periods to allow the pressure to closely approach initial reservoir pressure. The initial flow period is commonly 5 to 10 minutes, and the initial shut-in period is commonly 30 minutes to one hour. When plotted on a pressure buildup plot, extrapolation of the best straight line gives what is usually accepted as the best obtainable value of initial formation pressure.

0 0

Creator

  • BSchmidt
  •  (Gold) 2424 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.