Home > Term: initial flow period
initial flow period
A short flow period at the beginning of a drillstem test. This period is followed immediately by a longer shut-in period to allow the pressure to closely approach initial reservoir pressure. The initial flow period is commonly 5 to 10 minutes, and the initial shut-in period is commonly 30 minutes to one hour. When plotted on a pressure buildup plot, extrapolation of the best straight line gives what is usually accepted as the best obtainable value of initial formation pressure.
- Part of Speech: noun
- Industry/Domain: Oil & gas
- Category: Oilfield
- Company: Schlumberger
0
Creator
- BSchmidt
- 100% positive feedback