Home >  Term: cascading resource
cascading resource

A resource that can be taken over by more than one node. A takeover priority is assigned to each configured cluster resource group on a per-node basis. In the event of a takeover, the node with the highest priority acquires the resource group. If that node is unavailable, the node with the next-highest priority acquires the resource group, and so on.

0 0

Creator

  • PWH617
  •  (Gold) 1905 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.