Home > Term: adjusted flow time
adjusted flow time
The approximated flow time used for a well-test analysis when the flow rate varies before or during the test period. It is calculated as t = cumulative well production since the last extended shut-in period divided by the flow rate just before a well is shut in for a buildup test.
- Part of Speech: noun
- Industry/Domain: Oil & gas
- Category: Oilfield
- Company: Schlumberger
0
Creator
- BSchmidt
- 100% positive feedback