Home >  Blossary: Information Technology  >  Term: 7 wastes
7 wastes

A framework of seven types of activity that do not add value; originally defined by Toyota: overproducing — producing product before there’s a valid order; unnecessary waiting — lengthened cycle time, which reduces agility; unnecessary transportation — unnecessary transportation of material between sites; overprocessing — processes longer or more complex than necessary; unnecessary inventory — buildup of work-in-process or raw materials; unnecessary movement — inefficient workplace; layout causing extra work; and too many defects — poor process quality and too much rework. This list was extended by Gartner and others to include an eighth waste: asset underutilization or other underutilization of resources. The eight wastes are often referred to by the acronym “DOWNTIME,” meaning “Defects, Overproduction, Waiting, Nonutilized resources, Transportation, Inventory, Motion and Excessive processing.”

0 0

Information Technology

Category: Technology

Total terms: 1778

Creator

  • consultant
  • (New York - NY, United States)

  •  (Gold) 1811 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.